Skip to main content
Log in

Performance of the heuristic procedures for constrained projects with progress payments

  • Theoretical Paper
  • Published:
Journal of the Operational Research Society

Abstract

All large scale resource constrained projects involve cash flows occurring during their life cycle. Several recent studies consider the problem of scheduling projects to maximise the net present value (NPV) of these cash flows. Their basic common assumption is that cash flows are mainly associated with specific events and they occur at event realisation times. An alternative assumption, which can be more realistic, is that cash inflows occur periodically, for example every month, as progress payments. This article considers the problem of maximising NPV given the alternative assumption. Three different heuristic rules are developed. The performance of these heuristic rules is analysed through a full factorial experiment with 108 scheduling conditions. The results indicate that three rules provide near-optimal schedules with respect to NPV maximisation while producing time schedules that do not delay the project completion time extensively.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to C Sepil.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Sepil, C., Ortac, N. Performance of the heuristic procedures for constrained projects with progress payments. J Oper Res Soc 48, 1123–1130 (1997). https://doi.org/10.1057/palgrave.jors.2600458

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1057/palgrave.jors.2600458

Keywords

Navigation