Constructively simple estimating: a project management example

  • Theoretical Paper
  • Published:
Journal of the Operational Research Society

Abstract

A ‘constructively simple’ approach to estimating uses a decision support modelling paradigm based on project risk management and operational research concepts. It employs probability models selected from a set of alternative stochastic models of uncertainty with a view to maximising the insight provided, given an appropriate level of complexity. It addresses issues that include the joint use of subjective and objective probabilities, subjectivity of model data and structure, bias, data acquisition costs, the importance of getting an estimate right, optimising the estimating processes involved as a whole in approximate but robust terms, and differences in interpretation of what this means to estimators and users of estimates. Specific applications are necessarily context-specific to some extent, but the underlying ideas are of general applicability. This paper uses a simple example involving estimating the uncertain duration of a project activity to illustrate what is involved.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Figure 1
Figure 2
Figure 3

Similar content being viewed by others

References

  • Ward SC and Chapman CB (2003). Transforming project risk management into project uncertainty management. Int J Proj Mng 21: 97–105.

    Article  Google Scholar 

  • Ward SC (1989). Arguments for constructively simple models. J Opl Res Soc 40: 141–153.

    Article  Google Scholar 

  • Chapman CB and Ward SC (2000). Estimation and evaluation of uncertainty: a minimalist first pass approach. Int J Proj Mng 18: 369–383.

    Article  Google Scholar 

  • Chapman CB and Ward SC (2002). Managing Project Risk and Uncertainty: A Constructively Simple Approach to Decision Making. Wiley: Chichester.

    Google Scholar 

  • Hoel PG and Jessen RJ (1971). Basic Statistics for Business and Economics. Wiley: New York.

    Google Scholar 

  • Moder JJ and Philips CR (1970). Project Management with CPM and PERT. Van Nostrand: New York.

    Google Scholar 

  • Kahneman D, Slovic P and Tversky A (1982). Judgement under Uncertainty: Heuristics and Baises. Cambridge Press: Cambridge, MA.

    Book  Google Scholar 

  • Cooper DF and Chapman CB (1987). Risk Analysis for Large Projects. Wiley: Chichester.

    Google Scholar 

  • Chapman CB and Ward SC (1997). Project Risk Management: Process, Techniques and Insights. Wiley: Chichester.

    Google Scholar 

  • US Nuclear Regulatory Commission Reactor Safety Study (1975). An Assessment of Accident Risk in US Commercial Nuclear Power Plants. WASH-1400, NUREG-75/014.

  • Chapman CB (1979). Large engineering project risk analysis. IEEE Trans Engng Mngt EM-26: 78–86.

    Article  Google Scholar 

  • HM Treasury (2002). The Green Book — Consultation Paper. PSDA (Public Service Delivery Analysis), HM Treasury: London, UK.

  • Simon HA (1979). Rational decision-making in business organisations. Am Econ Rev 69: 493–513.

    Google Scholar 

  • Knight F (1921). Risk, Uncertainty and Profit. Houghton Miffon: Boston.

    Google Scholar 

Download references

Acknowledgements

We thank both referees for a number of very useful suggestions.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to C Chapman.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Chapman, C., Ward, S. Constructively simple estimating: a project management example. J Oper Res Soc 54, 1050–1058 (2003). https://doi.org/10.1057/palgrave.jors.2601610

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1057/palgrave.jors.2601610

Keywords

Navigation