Synchronized production–distribution planning in a single-plant multi-destination network

N Rizk, A Martel and S D'Amours

BACK TO ARTICLE

Table 1. Production indexes, parameters and sets

T The length of the planning horizon
t A planning period
i An item type: i=1,...,n for IP items and i=n+1,...,N for FP items
m A machine for the production of IP products: m=1,...,M
M i The set of machines m that manufacture item i
IP M The set of IP products manufactured by machine m (IP msub{1,...,n})
e m The eth item in the production sequence of machine m: e m=1m,...,f m (fless than or equal ton)
tau Production lead-time
d it Effective demand at the manufacturing location for item i during period t
C t m Production capacity of machine m in period t (in time units)
k it m Setup time required to start production of item iset symbolIP m on machine m at the beginning of period t
K it m Product iset symbolIP m changeover cost on machine m in period t
h it Inventory holding cost of item i at the manufacturer location in period t
g ii' Number of product i units required to produce one unit of product i'
a it m Production resource capacity consumption rate of item iset symbolIP m at machine m in period t
C i Set of the successors of product i in the BOM: C i={i'|g ii'>0}
BACK TO ARTICLE