Skip to main content
Log in

A note: a due-window assignment problem on parallel identical machines

  • Technical Note
  • Published:
Journal of the Operational Research Society

Abstract

We solve a due-window assignment problem on parallel identical machines. In addition to the standard objective of finding the optimal job schedule, in due-window assignment problems one has to assign a time interval during which goods are delivered to customers with no cost. Jobs scheduled prior to or after the due-window are penalized according to their earliness/tardiness value. We assume that jobs have identical processing times, but may have job-dependent earliness and tardiness costs (eg, due to possible different destinations). We show that the problem can be reduced to a non-standard asymmetric assignment problem, and introduce an efficient (O(n 4)) solution procedure.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Gordon V, Proth JM and Chu C (2002). A survey of the state-of-the-art of common due-date assignment and scheduling research . Eur J Opl Res 135: 1–25.

    Article  Google Scholar 

  • Hall NG and Posner ME (1991). Earliness-tardiness scheduling problems. I: Weighted deviation of completion times about a common due date . Opl Res 39: 836–846.

    Article  Google Scholar 

  • Janiak A, Kovalyov MY and Marek M (2007). Soft due window assignment and scheduling on parallel machines . IEEE T Syst Man Cyb :A 37: 614–620.

    Article  Google Scholar 

  • Janiak A and Winczaszek M (2004). A single processor scheduling problem with a common due window assignment. In: Fleuren H, den Hertog D and Kort P (eds), Operations Research Proceedings, pp. 213–220.

  • Janiak A and Winczaszek M (2006). Common due window assignment in parallel processor scheduling problem with nonlinear penalty functions . Lect Notes Comput Sci 3911: 132–139.

    Article  Google Scholar 

  • Liman SD, Panwalkar SS and Thongmee S (1996). Determination of common due window location in a single machine scheduling problem . Eur J Opl Res 93: 68–74.

    Article  Google Scholar 

  • Liman SD, Panwalkar SS and Thongmee S (1998). Common due window size and location determination in a single machine scheduling problem . J Opl Res Soc 49: 1007–1010.

    Article  Google Scholar 

  • Mosheiov G and Oron D (2004). Due-window assignment with unit processing-time jobs . Nav Res Log 51: 1005–1017.

    Article  Google Scholar 

  • Mosheiov G and Yovel U (2006). Minimizing weighted earliness-tardiness and due-date cost with unit processing-time jobs . Eur J Opl Res 172: 528–544.

    Article  Google Scholar 

  • Weng MX and Ventura JA (1996). A note on ‘common due-window scheduling' . Prod Opl Mngt 5: 194–200.

    Article  Google Scholar 

Download references

Acknowledgements

The first author is the Charles Rosen Professor of Management, The School of Business Administration, The Hebrew University. The paper was supported in past by the Recanati Fund of the School of Business Administration, The Hebrew University, Jerusalem, Israel.

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Mosheiov, G., Sarig, A. A note: a due-window assignment problem on parallel identical machines. J Oper Res Soc 62, 238–241 (2011). https://doi.org/10.1057/jors.2009.179

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1057/jors.2009.179

Keywords

Navigation