Article
Maritime Economics & Logistics (2008) 10, 310–321. doi:10.1057/mel.2008.8
A Simple Model for Estimating Newbuilding Costs
Robert F Mulligan1
1Department of Accountancy, Finance, Information Systems & Economics, College of Business, Western Carolina University, Cullowhee, NC, USA. E-mail: mulligan@wcu.edu
Abstract
This paper presents a simple model for estimating newbuilding costs. Regression equations are estimated on a large data set of recent 2003–2007 shipyard deliveries reported in Lloyd's Shipping Economist. The equations developed in this paper can be used in a wide variety of economic analyses involving new ship construction and operating costs. The models presented here capture the most modern design and construction techniques, and most up-to-date cost information, compared to those previously described in the literature.
Keywords:
Newbuilding costs, pooled data, modern ship designs, regression analysis
MORE ARTICLES LIKE THIS
These links to content published by Palgrave Macmillan are automatically generated.
RESEARCH
A Simple Model for Estimating Newbuilding CostsMaritime Economics & Logistics Article
Econometric Modelling of Second-hand Ship PricesMaritime Economics & Logistics Original Article
The Use of Capital Budgeting Techniques among UK-based Ship OperatorsInternational Journal of Maritime Economics Original Article
The Size Economies and Network Efficiency of Large ContainershipsInternational Journal of Maritime Economics Original Article
See all 18 matches for Research

